OEE stands for Overall Equipment Effectiveness — availability × performance × quality, the share of planned time a machine spent making good parts at full speed.

Updated November 20262 min read

← All glossary terms

OEE is the most widely used single number for how well a machine is used. This page gives the short answer; the full OEE guide covers the six big losses, benchmarks and how to raise it on a CNC floor.

The OEE formula

OEE = Availability × Performance × Quality. Each factor catches a different kind of loss:

  • Availability

    Formula
    Run time ÷ planned production time
    Loss it catches
    Stops and breakdowns
  • Performance

    Formula
    (Ideal cycle time × total parts) ÷ run time
    Loss it catches
    Running slower than ideal
  • Quality

    Formula
    Good parts ÷ total parts
    Loss it catches
    Scrap and rework

A machine at 100% OEE made only good parts, at its ideal speed, with no stops during planned time.

A worked example

One machine, one shift (illustrative numbers):

  • Availability

    Value
    380 min run ÷ 420 min planned = 90.5%
  • Performance

    Value
    (60 s ideal × 340 parts) ÷ 22,800 s run = 89.5%
  • Quality

    Value
    330 good ÷ 340 total = 97.1%

OEE = 90.5% × 89.5% × 97.1% ≈ 78.6%. Try your own shift in the OEE calculator, which shows each step of the maths.

Frequently asked questions

OEE is measured against planned production time only. TEEP is measured against all calendar time, so it also shows how much of the day the machine was never scheduled to run. TEEP is always equal to or lower than OEE.

No. OEE above 100% means the ideal cycle time in the calculation is slower than the machine really runs, so performance comes out above 100%. Correct the ideal cycle to the fastest proven cycle for that part and machine, and OEE drops back to a real figure.

Related terms

Filed under

Productivity metrics

Live demo

See ThingConnect on a real shop floor

A one-on-one walkthrough with our team.

Book a demo
Talk to our team

See OEE worked out per machine, per shift, from the controllers