Cycle time is the number most CNC shops quote a job on, and the one that most often turns out wrong once the job is running. The definition is simple; the useful part is knowing which pieces of time it includes.

The cycle time formula

Cycle time = Total running time ÷ Parts produced. For a single part, that running time splits into two pieces:

  • Cutting time — the tool feeding into material. For one pass it is cut length ÷ feed rate.
  • Non-cutting time — rapid moves, tool changes, spindle starts and stops, probing, coolant dwell.

Loading and unloading the part is usually kept out of cycle time and tracked as handling time, so a slow job can be traced to the program or to the operator side, not just “slow”.

A worked example

One shift on one turning machine (illustrative numbers):

  • Time the machine was running a program

    Value
    6 h 24 min (384 min)
  • Parts produced

    Value
    320
  • Programmed cycle time from CAM

    Value
    66 s

Actual cycle time = 384 min × 60 ÷ 320 = 72 s per part — 6 seconds, or about 9%, slower than the program says. Across 320 parts that gap is 32 minutes of running time the quote never accounted for. Try your own numbers in the cycle time calculator.

Programmed vs actual cycle time

The programmed time is an estimate made before the first chip. The actual time is what the machine did — with feed overrides, extra tool changes and stops included. The two drift apart quietly, which is why it pays to measure the actual number per part rather than trust the estimate.

ThingConnect measures it from the controller: each time the part counter goes up, the machine’s running time since the previous part becomes that part’s cycle time. Time the machine sat waiting is not counted, so a long tea break doesn’t make one part look slow. Reports then use the typical (median) cycle, so one odd part doesn’t skew the number either.

Frequently asked questions

No. Cycle time is how long the machine actually takes per part. Takt time is how often a part must finish to meet customer demand. If cycle time is longer than takt time, the machine can't keep up with orders without overtime or a second machine.

Start with the non-cutting time — rapid moves, tool changes and air cuts in the program — which is often easier to shorten than feeds and speeds. Then look for feeds held below the programmed value by override, and for tools that could cut faster if they were held more rigidly.

Related terms

Filed under

Machine time

Live demo

See ThingConnect on a real shop floor

A one-on-one walkthrough with our team.

Book a demo
Talk to our team

See the real cycle time of every part, measured from the machine itself