TEEP full form

TEEP stands for Total Effective Equipment Performance — the share of all calendar time a machine spent making good parts at full speed. TEEP = OEE × utilization.

Updated November 20263 min read

← All glossary terms

OEE tells you how well the shifts you planned actually went. TEEP asks a bigger question: of every hour in the day, how many turned into good parts? That makes it the number to look at when the real question is capacity, not performance.

The TEEP formula

TEEP = OEE × Utilization, where utilization here means planned production time ÷ all calendar time — how much of the day was scheduled at all. Put together, TEEP is fully productive time divided by calendar time.

Note that this “utilization” is about the schedule, not about how long the machine ran. The everyday shop-floor measure is covered on the machine utilization formula page.

A worked example

One machine over one day (illustrative numbers):

  • Calendar time

    Value
    24 h
  • Planned production time (two shifts)

    Value
    16 h
  • OEE for those two shifts

    Value
    65%

Utilization = 16 ÷ 24 = 66.7%. TEEP = 65% × 66.7% = 43.3%. A respectable OEE, but less than half of the machine’s day produced good parts. The gap is mostly the unscheduled third shift, not anything the operators did.

When to use TEEP vs OEE

  • Use OEE to improve the shifts you run — breakdowns, slow cycles, rejects. See the OEE guide.
  • Use TEEP before buying a machine or adding a shift: a low TEEP on existing machines often means the capacity is already there, just unscheduled.

Both need trustworthy running time per machine, which is what machine utilization tracking from controller data provides.

Frequently asked questions

No. TEEP multiplies OEE by the share of calendar time that was scheduled, which can never be more than 100%. So TEEP equals OEE only when a machine is scheduled around the clock, and is lower whenever any part of the day is unscheduled.

A week or a month rather than a single shift. TEEP is a capacity measure, and short windows swing with one-off overtime, holidays or a lost shift. A monthly TEEP per machine is usually enough to see whether unscheduled hours are hiding spare capacity.

Related terms

Filed under

Productivity metrics

Live demo

See ThingConnect on a real shop floor

A one-on-one walkthrough with our team.

Book a demo
Talk to our team

See OEE and utilization per machine, measured from controller data