Part count is the CNC controller’s running total of finished parts, usually increased by one each time the program reaches its end.

Updated November 20263 min read

← All glossary terms

The part counter is the most-used number a CNC control keeps — and the easiest to get quietly wrong. It counts program endings, not good parts.

What makes it count

Most controls increase the counter when the program reaches its end — typically M30 (program end and rewind) or M02, or a specific M-code the control is set to count on. Many controls also hold a target count next to it, the number of parts the job needs.

Some shops don’t use the built-in counter at all. Instead, the program adds one to a macro variable at the end of each part, which gives full control over what counts.

Why the count can be wrong

  • Program loops with M99 instead of ending with M30

    What happens to the count
    Never increases
  • Multi-part fixture (several parts per cycle)

    What happens to the count
    Counts one per cycle, not per part
  • Prove-out or dry run

    What happens to the count
    Counts parts that were never made
  • Operator resets or edits the counter

    What happens to the count
    Jumps or drops
  • Rejected part

    What happens to the count
    Still counted — the counter knows nothing about quality

The counter is a record of program endings. Good-part numbers need rejects subtracted on top — see FPY.

Turning counts into cycle time

ThingConnect reads the counter directly from the controller — or, where a shop counts with a macro variable, reads that variable instead. Each time the count goes up, a part is complete, and the time since the previous part becomes its cycle time. If one cycle makes two parts and the program adds two to the counter, both are credited, and parts per cycle can be set per part so the hourly target accounts for it.

If the connection drops and the count has jumped by several when it returns, those parts are not credited as one impossibly fast cycle — the gap is flagged instead of trusted.

Frequently asked questions

Resetting at shift start makes the screen easy to read, but every reset is a chance to lose the count. Many shops leave the total running and take shift output as the difference between two readings, or count in a protected macro variable instead.

Compare it with a physical count for one shift: finished parts in the bin plus rejects, against the change in the counter. If they differ, look for programs that loop without ending, prove-out runs, multi-part fixtures or manual resets — the usual causes.

Related terms

Filed under

Productivity metrics

Live demo

See ThingConnect on a real shop floor

A one-on-one walkthrough with our team.

Book a demo
Talk to our team

See part counts and cycle times from every controller, live