Takt time is the pace production must keep to meet customer demand — net available production time divided by the number of parts the customer needs.

Updated November 20262 min read

← All glossary terms

Takt time doesn’t describe the machine at all — it describes the customer. It is the rhythm the floor has to hit so that what gets made matches what gets ordered.

The takt time formula

Takt time = Net available production time ÷ Customer demand, for the same period. Net available time is the shift minus planned breaks and scheduled stops — not the full clock time.

A worked example

One shift on one part number (illustrative numbers):

  • Shift length

    Value
    480 min
  • Planned breaks and stops

    Value
    60 min
  • Net available time

    Value
    420 min (25,200 s)
  • Customer demand this shift

    Value
    300 parts

Takt time = 25,200 s ÷ 300 = 84 s per part. A part has to come off the machine every 84 seconds to keep up. Run the numbers for your own shift in the takt time calculator.

Takt time vs cycle time

Takt is the target; cycle time is what the machine actually does. With the 84-second takt above, a machine running a 72-second cycle has slack for handling and small stops; one running a 90-second cycle falls six seconds further behind with every part.

ThingConnect measures the real cycle time of every part from the controller’s part counter, so the comparison against takt uses what happened on the floor, not the program’s estimate.

Frequently asked questions

Takt comes from the German word for a beat or rhythm, as in a conductor’s baton. In manufacturing it is the beat production has to keep: one finished part every takt interval, so output matches what the customer is ordering.

Yes. Takt is recalculated whenever orders or the available time change. A higher order rate shortens takt, so a machine that kept up comfortably last month can fall behind this month without running any slower, simply because more parts are now needed.

Related terms

Filed under

Productivity metrics

Live demo

See ThingConnect on a real shop floor

A one-on-one walkthrough with our team.

Book a demo
Talk to our team

Compare every machine’s real cycle time against takt, live